rissay.typepad.com > Trinity- Existing

« Back to Trinity- Existing

Kitchen

Kitchen

Here is the largest part the previous contractor botched and ran from. He installed extremely low grade cabinets and didn't even bother to install the sink base. He patched holes in the soffit with aluminum and duct tape. He also sealed the drywall joints with duct tape... The drywall was never finished. Then one day, he just left... Luckily, we are here to not only fix everything, but greatly improve upon it. Practically everything in the house, except the exterior masonry walls and joists are being replaced.

Permalink